Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,213
matching recommendationsNAICS | 3331 | Agriculture, Construction, and Mining Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0227 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $4,289 | $9,282 | Implemented |
UU0227 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,237 | $6,000 | Implemented |
UU0227 # 10 Y:2023 | 10 | 2023 | MINIMIZE WATER USAGE | $2,457 | $2,652 | Implemented |
UU0227 # 11 Y:2023 | 11 | 2023 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $2,160 | $2,000 | Not Implemented |
UU0227 # 12 Y:2023 | 12 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $53 | $333 | Implemented |
MZ0348 # 07 Y:2023 | 07 | 2023 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,203 | $4,132 | Not Implemented |
MZ0348 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,751 | $5,386 | Implemented |
MZ0348 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $3,429 | $830 | Not Implemented |
MZ0348 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,917 | $1,548 | Implemented |
MZ0348 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,900 | $2,660 | Not Implemented |
MZ0348 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,209 | $3,330 | Not Implemented |
MZ0348 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $13,016 | $3,000 | Implemented |
NT0006 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $151,941 | $2,205,000 | Not Implemented |
NT0006 # 05 Y:2023 | 05 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $16,552 | $0 | Not Implemented |
NT0006 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $12,361 | $27,064 | Not Implemented |
NT0006 # 01 Y:2023 | 01 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $34,941 | $10,056 | Not Implemented |
NT0006 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,685 | $0 | Not Implemented |
NT0006 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,942 | $0 | Not Implemented |
SD0631 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,593 | $4,339 | Not Implemented |
SD0631 # 07 Y:2023 | 07 | 2023 | INSULATE BARE EQUIPMENT | $1,509 | $4,973 | Not Implemented |
SD0631 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $928 | $2,934 | Not Implemented |
SD0631 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,208 | $16,000 | Not Implemented |
SD0631 # 04 Y:2023 | 04 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $3,553 | $3,535 | Not Implemented |
SD0631 # 03 Y:2023 | 03 | 2023 | USE PHOTOCELL CONTROLS | $754 | $1,124 | Implemented |
SD0631 # 02 Y:2023 | 02 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $15,108 | $70,650 | Not Implemented |