IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,205

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0348 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,917 $1,548 Implemented
MZ0348 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,900 $2,660 Not Implemented
MZ0348 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,209 $3,330 Not Implemented
MZ0348 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $13,016 $3,000 Implemented
NT0006 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $151,941 $2,205,000 Not Implemented
NT0006 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $16,552 $0 Not Implemented
NT0006 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $12,361 $27,064 Not Implemented
NT0006 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,942 $0 Not Implemented
NT0006 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,685 $0 Not Implemented
NT0006 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $34,941 $10,056 Not Implemented
SD0631 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,593 $4,339 Not Implemented
SD0631 # 07 Y:2023 07 2023 INSULATE BARE EQUIPMENT $1,509 $4,973 Not Implemented
SD0631 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $928 $2,934 Not Implemented
SD0631 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,208 $16,000 Not Implemented
SD0631 # 04 Y:2023 04 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $3,553 $3,535 Not Implemented
SD0631 # 03 Y:2023 03 2023 USE PHOTOCELL CONTROLS $754 $1,124 Implemented
SD0631 # 02 Y:2023 02 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $15,108 $70,650 Not Implemented
SD0631 # 01 Y:2023 01 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,583 $10,494 Not Implemented
OK1087 # 01 Y:2023 01 2023 USE RADIANT HEATER FOR SPOT HEATING $18,209 $91,432 Implemented
OK1087 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,063 $2,450 Not Implemented
OK1087 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,173 $0 Not Implemented
OK1087 # 07 Y:2023 07 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,468 $72,450 Implemented
OK1087 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,321 $11,550 Implemented
OK1087 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $71,142 $168,192 Implemented
OK1087 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,963 $2,426 Not Implemented