IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0131 # 08 Y:2019 08 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,915 $0 Implemented
WM0131 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $455 $600 Not Implemented
WM0051 # 08 Y:2014 08 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,378 $3,000 Not Implemented
WM0051 # 09 Y:2014 09 2014 REPLACE BOILER $11,306 $16,000 Implemented
WM0051 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,648 $27,260 Implemented
WM0051 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $15,358 $6,250 Not Implemented
WM0051 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $2,736 $800 Not Implemented
WM0051 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,050 $225 Implemented
WM0051 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,680 $3,200 Not Implemented
WM0051 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,680 $5,175 Not Implemented
WM0051 # 07 Y:2014 07 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,345 $35,000 Not Implemented
WM0047 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,970 $0 Implemented
WM0047 # 03 Y:2014 03 2014 REPLACE BOILER $18,181 $49,000 Not Implemented
WM0047 # 02 Y:2014 02 2014 USE SYNTHETIC LUBRICANT $16,363 $3,379 Not Implemented
WM0047 # 01 Y:2014 01 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,205 $13,000 Implemented
WM0047 # 05 Y:2014 05 2014 REDUCE FLUID FLOW RATES $11,396 $1,567 Not Implemented
WM0047 # 06 Y:2014 06 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,884 $0 Not Implemented
WM0047 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $2,925 $5,500 Not Implemented
WM0047 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,510 $3,628 Not Implemented
WM0047 # 09 Y:2014 09 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,932 $2,100 Implemented
WM0047 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $1,180 Implemented
WI0523 # 06 Y:2006 06 2006 USE SYNTHETIC LUBRICANT $1,970 $0 Implemented
WI0523 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,735 $800 Not Implemented
WI0523 # 04 Y:2006 04 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,880 $0 Not Implemented
WI0523 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,347 $1,000 Implemented