Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsNAICS | 3331 | Agriculture, Construction, and Mining Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0027 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $176 | $351 | n/a |
CC0027 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,571 | $25,000 | n/a |
CC0027 # 04 Y:2023 | 04 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,831 | $10,000 | n/a |
CC0027 # 05 Y:2023 | 05 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $26,412 | $80,000 | n/a |
CC0027 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,831 | $93,870 | n/a |
CC0027 # 07 Y:2023 | 07 | 2023 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $91 | $600 | n/a |
CC0027 # 08 Y:2023 | 08 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $27,290 | $782,250 | n/a |
CC0027 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,444 | $8,455 | n/a |
NC0517 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,395 | $100 | Implemented |
NC0517 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,506 | $15,200 | Not Implemented |
NC0517 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,090 | $12,500 | Not Implemented |
NC0517 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,226 | $215,258 | Implemented |
NC0517 # 04 Y:2014 | 04 | 2014 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $6,998 | $2,000 | Not Implemented |
NC0517 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $74,398 | $162,227 | Implemented |
NC0517 # 11 Y:2014 | 11 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,806 | $5,000 | Not Implemented |
NC0517 # 13 Y:2014 | 13 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $525 | $160 | Not Implemented |
NC0517 # 07 Y:2014 | 07 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,941 | $5,000 | Not Implemented |
NC0517 # 10 Y:2014 | 10 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,346 | $200 | Implemented |
NC0517 # 01 Y:2014 | 01 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $18,930 | $1,250 | Implemented |
NC0517 # 09 Y:2014 | 09 | 2014 | INSTALL COMMON HEADER ON COMPRESSORS | $9,004 | $8,600 | Not Implemented |
NC0517 # 12 Y:2014 | 12 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $1,458 | $4,256 | Not Implemented |
NC0458 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $453 | $100 | Implemented |
NC0458 # 06 Y:2012 | 06 | 2012 | IMPROVE SPACE COMFORT CONDITIONING | $83,263 | $35,225 | Not Implemented |
NC0458 # 08 Y:2012 | 08 | 2012 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $211,680 | $48,800 | Implemented |
NC0458 # 07 Y:2012 | 07 | 2012 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $196,000 | $25,000 | Not Implemented |