IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0517 # 01 Y:2014 01 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,930 $1,250 Implemented
NC0517 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74,398 $162,227 Implemented
NC0517 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,395 $100 Implemented
NC0517 # 09 Y:2014 09 2014 INSTALL COMMON HEADER ON COMPRESSORS $9,004 $8,600 Not Implemented
NC0517 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,226 $215,258 Implemented
NC0517 # 04 Y:2014 04 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,998 $2,000 Not Implemented
NC0517 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,090 $12,500 Not Implemented
NC0517 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,941 $5,000 Not Implemented
NC0517 # 11 Y:2014 11 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,806 $5,000 Not Implemented
NC0517 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,506 $15,200 Not Implemented
NC0517 # 10 Y:2014 10 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,346 $200 Implemented
NC0517 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $1,458 $4,256 Not Implemented
NC0517 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $525 $160 Not Implemented
NC0458 # 02 Y:2012 02 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,650 $1,040 Not Implemented
NC0458 # 08 Y:2012 08 2012 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $211,680 $48,800 Implemented
NC0458 # 07 Y:2012 07 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $196,000 $25,000 Not Implemented
NC0458 # 06 Y:2012 06 2012 IMPROVE SPACE COMFORT CONDITIONING $83,263 $35,225 Not Implemented
NC0458 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $169 $250 Implemented
NC0458 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $3,659 $441 Implemented
NC0458 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,851 $26,563 Implemented
NC0458 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $453 $100 Implemented
NC0432 # 06 Y:2011 06 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,893 $72,000 Not Implemented
NC0432 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $177 Implemented
NC0432 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,640 $600 Implemented
NC0432 # 03 Y:2011 03 2011 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $1,290 $3,700 Not Implemented