Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
117
matching recommendationsNAICS | 3331 | Agriculture, Construction, and Mining Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0384 # 09 Y:2004 | 09 | 2004 | INSULATE BARE EQUIPMENT | $902 | $251 | Implemented |
AS0384 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $904 | $961 | Not Implemented |
AS0384 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,575 | $20 | Implemented |
AS0384 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,696 | $3,600 | Not Implemented |
AS0384 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,859 | $180 | Implemented |
AS0384 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,206 | $88,805 | Not Implemented |
AS0384 # 03 Y:2004 | 03 | 2004 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $26,000 | $22,316 | Implemented |
AS0384 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,877 | $495 | Not Implemented |
AS0384 # 01 Y:2004 | 01 | 2004 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $58,500 | $1,130 | Not Implemented |
LL0197 # 07 Y:2004 | 07 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,500 | $30 | Implemented |
LL0197 # 05 Y:2004 | 05 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $745 | $152 | Implemented |
LL0197 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,042 | $2,920 | Implemented |
LL0197 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,102 | $30 | Implemented |
OK0678 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $546 | $1,154 | Implemented |
LL0197 # 04 Y:2004 | 04 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,020 | $990 | Implemented |
OK0678 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,075 | $823 | Implemented |
LL0197 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $323 | $245 | Implemented |
OK0678 # 05 Y:2004 | 05 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $22,602 | $28,350 | Not Implemented |
LL0197 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,439 | $30 | Not Implemented |
OK0678 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,847 | $14,078 | Not Implemented |
OK0678 # 06 Y:2004 | 06 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,188 | $12,597 | Not Implemented |
OK0678 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,836 | $10,835 | Implemented |
OK0678 # 04 Y:2004 | 04 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,162 | $800 | Implemented |
OK0678 # 07 Y:2004 | 07 | 2004 | INSTALL SET-BACK TIMERS | $3,347 | $2,200 | Implemented |
OK0678 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,817 | $3,690 | Implemented |