IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

251

matching recommendations
Reset
NAICS 333111 Farm Machinery and Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0090 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,629 $7,670 Implemented
NL0090 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $822 $1,190 Not Implemented
NL0090 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $565 $831 Not Implemented
NL0090 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,382 $4,500 Implemented
NL0090 # 04 Y:2023 04 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,454 $1,764 Not Implemented
NL0090 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,602 $19,848 Implemented
MZ0348 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,209 $3,330 Not Implemented
MZ0348 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $13,016 $3,000 Implemented
MZ0348 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,917 $1,548 Implemented
MZ0348 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,900 $2,660 Not Implemented
MZ0348 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,751 $5,386 Implemented
MZ0348 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $3,429 $830 Not Implemented
MZ0348 # 07 Y:2023 07 2023 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,203 $4,132 Not Implemented
SD0631 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,208 $16,000 Not Implemented
SD0631 # 07 Y:2023 07 2023 INSULATE BARE EQUIPMENT $1,509 $4,973 Not Implemented
SD0631 # 04 Y:2023 04 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $3,553 $3,535 Not Implemented
SD0631 # 02 Y:2023 02 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $15,108 $70,650 Not Implemented
SD0631 # 03 Y:2023 03 2023 USE PHOTOCELL CONTROLS $754 $1,124 Implemented
SD0631 # 01 Y:2023 01 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,583 $10,494 Not Implemented
SD0631 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $928 $2,934 Not Implemented
SD0631 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,593 $4,339 Not Implemented
IC0262 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,327 $4,150 Not Implemented
IC0262 # 02 Y:2022 02 2022 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $356 $5,338 Not Implemented
IC0262 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,351 $33,110 Not Implemented
AM0848 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,821 $1,000 Implemented