IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

251

matching recommendations
Reset
NAICS 333111 Farm Machinery and Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0265 # 08 Y:2019 08 2019 OPTIMIZE PLANT POWER FACTOR $14,079 $20,625 Implemented
MZ0265 # 09 Y:2019 09 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,984 $2,731 Not Implemented
MZ0265 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,033 $4,192 Implemented
MZ0265 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,079 $2,052 Implemented
MZ0265 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,922 $1,406 Implemented
MZ0265 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $5,073 $1,940 Implemented
MZ0265 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $9,670 $3,552 Not Implemented
MZ0265 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,740 $2,302 Not Implemented
MZ0265 # 01 Y:2019 01 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,096 $10,000 Implemented
UA0183 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $4,515 $5,556 Not Implemented
UA0183 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,700 $31,835 Implemented
UA0183 # 04 Y:2017 04 2017 MODIFY STARTUP/SHUTDOWN TIMES $5,696 $0 Not Implemented
UA0183 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,024 $500 Implemented
UA0183 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,373 $1,365 Implemented
UA0183 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $433 $294 Not Implemented
UA0183 # 03 Y:2017 03 2017 BURN A LESS EXPENSIVE GRADE OF FUEL $4,865 $13,083 Not Implemented
IA0568 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,708 $422 Not Implemented
IA0568 # 01 Y:2016 01 2016 REVISE SMOKE CLEANUP FROM OPERATIONS $32,058 $60,740 Implemented
IA0568 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,266 $9,189 Implemented
IA0568 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,386 $5,977 Implemented
IA0568 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,316 $5,006 Not Implemented
IA0568 # 06 Y:2016 06 2016 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $472 $200 Implemented
IA0565 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $3,083 $5,550 Not Implemented
IA0565 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,616 $5,218 Not Implemented
IA0565 # 04 Y:2016 04 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,371 $500 Implemented