Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
322
matching recommendationsNAICS | 33312 | Construction Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0380 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $138 | $980 | Not Implemented |
NC0380 # 08 Y:2008 | 08 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $1,283 | $1,540 | Implemented |
UU0108 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $3,970 | $3,720 | Not Implemented |
UU0108 # 02 Y:2006 | 02 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $28,070 | $10,000 | Not Implemented |
UU0108 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,560 | $2,670 | Not Implemented |
UU0108 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,120 | $4,365 | Not Implemented |
UU0108 # 05 Y:2006 | 05 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $9,940 | $30,000 | Not Implemented |
BD0301 # 01 Y:2006 | 01 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $94,570 | $91,000 | Implemented |
BD0301 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $43,599 | $22,780 | Implemented |
BD0301 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,786 | $1,800 | Implemented |
BD0301 # 04 Y:2006 | 04 | 2006 | USE PHOTOCELL CONTROLS | $1,759 | $1,750 | Implemented |
BD0301 # 05 Y:2006 | 05 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,640 | $500 | Implemented |
BD0301 # 06 Y:2006 | 06 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $911 | $1,960 | Not Implemented |
BD0301 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $763 | $500 | Implemented |
BD0301 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $342 | $350 | Implemented |
BD0301 # 09 Y:2006 | 09 | 2006 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $40,050 | $22,800 | Not Implemented |
BD0301 # 10 Y:2006 | 10 | 2006 | AUTOMATE FINISHING PROCESS | $1,669,200 | $285,000 | Implemented |
BD0301 # 11 Y:2006 | 11 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $995 | $0 | Implemented |
CO0577 # 01 Y:2005 | 01 | 2005 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $141,620 | $513,000 | Not Implemented |
CO0577 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $135,890 | $303,800 | Implemented |
CO0577 # 03 Y:2005 | 03 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $89,400 | $41,000 | Implemented |
CO0577 # 04 Y:2005 | 04 | 2005 | MODIFY WORKLOAD | $48,020 | $360 | Implemented |
CO0577 # 05 Y:2005 | 05 | 2005 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $3,420 | $6,000 | Implemented |
CO0577 # 06 Y:2005 | 06 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $270 | $340 | Implemented |
CO0577 # 07 Y:2005 | 07 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $810 | $3,070 | Not Implemented |