IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

322

matching recommendations
Reset
NAICS 33312 Construction Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0121 # 11 Y:2022 11 2022 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $545 $90 Not Implemented
CW0121 # 12 Y:2022 12 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $48,258 $14,344 Implemented
WM0173 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $579 $900 Not Implemented
WM0173 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $592 $1,990 Not Implemented
WM0173 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,513 $3,500 Not Implemented
WM0173 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,009 $0 Not Implemented
WM0173 # 02 Y:2021 02 2021 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $3,422 $1,240 Not Implemented
WM0173 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,890 $15,481 Not Implemented
OR0748 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $2,032 $9,520 Implemented
OR0748 # 04 Y:2022 04 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $99,431 $292,453 Implemented
OR0748 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $3,913 $10,533 Implemented
OR0748 # 02 Y:2022 02 2022 FILTER AND REUSE HYDRAULIC OIL $34,830 $88,699 Implemented
OR0748 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,763 $1,880 Implemented
WM0166 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $328 $1,500 Not Implemented
WM0166 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $1,099 $1,200 Not Implemented
WM0166 # 04 Y:2021 04 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,198 $2,170 Implemented
WM0166 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,884 $3,500 Not Implemented
WM0166 # 02 Y:2021 02 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,928 $36,500 Not Implemented
WM0166 # 01 Y:2021 01 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,220 $10,675 Not Implemented
WM0165 # 09 Y:2021 09 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,028 $2,237 Not Implemented
WM0165 # 08 Y:2021 08 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,497 $0 Not Implemented
WM0165 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,598 $3,500 Not Implemented
WM0165 # 06 Y:2021 06 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,324 $4,100 Not Implemented
WM0165 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,370 $1,800 Not Implemented
WM0165 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,552 $6,405 Not Implemented