IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

551

matching recommendations
Reset
NAICS 33313 Mining and Oil and Gas Field Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2208 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $304 $114 Not Implemented
LS2208 # 06 Y:2022 06 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,660 $2,800 Not Implemented
LS2208 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $975 $240 Not Implemented
LS2208 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,527 $450 Implemented
LS2208 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $651 $50 Not Implemented
LS2208 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $7,289 $200 Implemented
LS2208 # 01 Y:2022 01 2022 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $378 $10 Not Implemented
OK1064 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,414 $774 Implemented
OK1064 # 03 Y:2022 03 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $367 $700 Implemented
OK1064 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,321 $22,000 Implemented
OK1064 # 01 Y:2022 01 2022 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,509 $2,061 Not Implemented
WV0608 # 05 Y:2021 05 2021 DEVELOP A REPAIR/REPLACE POLICY $746 $300 Implemented
WV0608 # 04 Y:2021 04 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $952 $0 Implemented
WV0608 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,836 $1,100 Implemented
WV0608 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,495 $38,306 Not Implemented
WV0608 # 01 Y:2021 01 2021 UPGRADE CONTROLS ON COMPRESSORS $32,464 $14,300 Not Implemented
AM0822 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,600 $3,400 Not Implemented
AM0822 # 02 Y:2021 02 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,940 $15,000 Not Implemented
AM0822 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,370 $30,000 Not Implemented
AM0822 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $21,250 $22,150 Not Implemented
AM0822 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $2,117 Not Implemented
AM0822 # 06 Y:2021 06 2021 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $75 $152 Not Implemented
AM0822 # 07 Y:2021 07 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $5,200 $1,350 Not Implemented
AM0811 # 06 Y:2020 06 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $460 $200 Implemented
AM0811 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,530 $255 Implemented