IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

749

matching recommendations
Reset
NAICS 3332 Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0467 # 09 Y:2016 09 2016 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,320 $7,050 n/a
MZ0207 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,485 $27,300 Implemented
MZ0207 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,482 $3,430 Implemented
MZ0207 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,538 $880 Implemented
MZ0207 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,096 $1,500 Not Implemented
MZ0207 # 05 Y:2015 05 2015 ELIMINATE/REDUCE AN OPERATION $149 $0 Implemented
BS0066 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,458 $568 Not Implemented
BS0066 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,531 $26 Not Implemented
BS0066 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,219 $907 Not Implemented
BS0066 # 04 Y:2015 04 2015 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,249 $80 Not Implemented
BS0066 # 05 Y:2015 05 2015 COMBINE UTILITY METERS $258 $253 Not Implemented
BS0066 # 06 Y:2015 06 2015 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $13,061 $19,065 Not Implemented
BS0066 # 07 Y:2015 07 2015 OPTIMIZE PLANT POWER FACTOR $12,093 $25,245 Not Implemented
BS0066 # 08 Y:2015 08 2015 MINIMIZE WATER USAGE $702 $5,938 Not Implemented
UK1509 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $1,084 $1,708 Not Implemented
UK1509 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,334 $0 Not Implemented
UK1509 # 03 Y:2015 03 2015 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $218 $0 Implemented
UK1509 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $273 $0 Implemented
UK1509 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,421 $1,200 Not Implemented
UK1509 # 06 Y:2015 06 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $178 $0 Implemented
UK1509 # 07 Y:2015 07 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,118 $800 Implemented
UK1509 # 08 Y:2015 08 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,869 $10,000 Implemented
UK1509 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $9,895 $4,000 Implemented
UK1509 # 10 Y:2015 10 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,561 $1,306 Not Implemented
UK1509 # 11 Y:2015 11 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,014 $1,858 Implemented