IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

740

matching recommendations
Reset
NAICS 3332 Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0082 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,970 $0 Not Implemented
TA0082 # 06 Y:2004 06 2004 REDUCE HEAT GAIN BY WINDOW TINTING $2,820 $7,720 Not Implemented
UD0706 # 01 Y:2004 01 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $144,536 $30,000 Not Implemented
UD0706 # 02 Y:2004 02 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $18,275 $40,280 Not Implemented
UD0706 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,881 $6,152 Not Implemented
UD0706 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,779 $570 Not Implemented
UD0706 # 05 Y:2004 05 2004 REDUCE SCRAP PRODUCTION $5,291 $1,000 Not Implemented
UD0706 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,549 $500 Not Implemented
UD0706 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,205 $2,106 Not Implemented
UD0706 # 08 Y:2004 08 2004 USE RADIANT HEATER FOR SPOT HEATING $1,883 $3,883 Not Implemented
UD0706 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,558 $0 Not Implemented
UD0706 # 10 Y:2004 10 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $42 $0 Not Implemented
SU0194 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $662 $0 Implemented
SU0194 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $734 $11 Implemented
SU0194 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,623 $1,616 Implemented
SU0194 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $2,404 $868 Implemented
SU0194 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,484 $576 Implemented
SU0194 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $154 Implemented
SU0194 # 07 Y:2004 07 2004 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $1,122 $2,975 Not Implemented
GT0775 # 01 Y:2004 01 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,720 $1,559 Implemented
GT0775 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,360 $850 Implemented
GT0775 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $418 $1,559 Not Implemented
GT0775 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $535 $655 Not Implemented
GT0775 # 05 Y:2004 05 2004 UPGRADE OBSOLETE EQUIPMENT $793 $504 Implemented
GT0775 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $296 $980 Implemented