IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 3332 Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0467 # 09 Y:2012 09 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $34,729 $15,000 Implemented
NC0467 # 08 Y:2012 08 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $459 $300 Implemented
NC0467 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $245 $100 Implemented
NC0467 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $347 $1,200 Not Implemented
NC0467 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $448 $525 Implemented
NC0467 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,208 $1,180 Implemented
NC0467 # 03 Y:2012 03 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $3,485 $18,400 Not Implemented
NC0467 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $1,265 Not Implemented
NC0467 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $146 $652 Implemented
NC0379 # 02 Y:2008 02 2008 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $333 $100 Implemented
NC0379 # 08 Y:2008 08 2008 DEVELOP A REPAIR/REPLACE POLICY $834 $1,728 Implemented
NC0379 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101 $308 Implemented
NC0379 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $269 $100 Implemented
NC0379 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $237 $50 Implemented
NC0379 # 04 Y:2008 04 2008 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,284 $3,000 Implemented
NC0379 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $7,706 $25,500 Not Implemented
NC0379 # 01 Y:2008 01 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $871 $800 Implemented
NC0262 # 03 Y:2003 03 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $4,320 $5,653 Not Implemented
NC0262 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,339 $50 Not Implemented
NC0262 # 05 Y:2003 05 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,272 $5,225 Not Implemented
NC0262 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,284 $800 Not Implemented
NC0262 # 02 Y:2003 02 2003 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $33,773 $55,000 Not Implemented
NC0262 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,471 $10,000 Not Implemented