IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 33324 Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0654 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,472 $2,019 n/a
SD0654 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,573 $12,716 n/a
SD0654 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,314 $4,469 n/a
SD0654 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,410 $7,109 n/a
SD0654 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,069 $20,212 n/a
SD0654 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $51,545 $70,429 n/a
SD0654 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,846 $1,355 n/a
SF0561 # 06 Y:2020 06 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,263 $18,437 Not Implemented
SF0561 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,548 $4,226 Implemented
SF0561 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,435 $3,959 Not Implemented
SF0561 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $3,116 $1,412 Implemented
SF0561 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,203 $110 Not Implemented
SF0561 # 01 Y:2020 01 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,397 $525 Not Implemented
SF0561 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $35,550 $236,909 Implemented
SD0468 # 01 Y:2013 01 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,265 $23,840 Implemented
SD0468 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,073 $700 Implemented
SD0468 # 04 Y:2013 04 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,973 $5,650 Not Implemented
SD0468 # 03 Y:2013 03 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,278 $1,600 Implemented
SD0468 # 02 Y:2013 02 2013 MODIFY STARTUP/SHUTDOWN TIMES $7,607 $1,050 Implemented
SF0418 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $84 $107 Not Implemented
SF0418 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,705 $0 Not Implemented
SF0418 # 06 Y:2012 06 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,222 $0 Not Implemented
SF0418 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,230 $15,467 Implemented
SF0418 # 03 Y:2012 03 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,193 $9,787 Not Implemented
SF0418 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $40,533 $0 Implemented