Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 33324 | Industrial Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0654 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,472 | $2,019 | n/a |
SD0654 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,573 | $12,716 | n/a |
SD0654 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,314 | $4,469 | n/a |
SD0654 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,410 | $7,109 | n/a |
SD0654 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,069 | $20,212 | n/a |
SD0654 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $51,545 | $70,429 | n/a |
SD0654 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,846 | $1,355 | n/a |
SF0561 # 06 Y:2020 | 06 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,263 | $18,437 | Not Implemented |
SF0561 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,548 | $4,226 | Implemented |
SF0561 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,435 | $3,959 | Not Implemented |
SF0561 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $3,116 | $1,412 | Implemented |
SF0561 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,203 | $110 | Not Implemented |
SF0561 # 01 Y:2020 | 01 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,397 | $525 | Not Implemented |
SF0561 # 07 Y:2020 | 07 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,550 | $236,909 | Implemented |
SD0468 # 01 Y:2013 | 01 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $8,265 | $23,840 | Implemented |
SD0468 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,073 | $700 | Implemented |
SD0468 # 04 Y:2013 | 04 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,973 | $5,650 | Not Implemented |
SD0468 # 03 Y:2013 | 03 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,278 | $1,600 | Implemented |
SD0468 # 02 Y:2013 | 02 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $7,607 | $1,050 | Implemented |
SF0418 # 08 Y:2012 | 08 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $84 | $107 | Not Implemented |
SF0418 # 07 Y:2012 | 07 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,705 | $0 | Not Implemented |
SF0418 # 06 Y:2012 | 06 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,222 | $0 | Not Implemented |
SF0418 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,230 | $15,467 | Implemented |
SF0418 # 03 Y:2012 | 03 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,193 | $9,787 | Not Implemented |
SF0418 # 01 Y:2012 | 01 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $40,533 | $0 | Implemented |