IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 33324 Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0218 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,883 $8,244 Not Implemented
IC0218 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,151 $14,700 Not Implemented
IC0218 # 02 Y:2019 02 2019 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $63,690 $6,300 Not Implemented
IC0218 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,997 $8,799 Not Implemented
BD0457 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,644 $4,500 Not Implemented
BD0457 # 15 Y:2015 15 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175 $480 Not Implemented
BD0457 # 14 Y:2015 14 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $181 $5 Not Implemented
BD0457 # 13 Y:2015 13 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $900 Not Implemented
BD0457 # 12 Y:2015 12 2015 INSTALL OCCUPANCY SENSORS $236 $375 Not Implemented
BD0457 # 11 Y:2015 11 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $325 $40 Not Implemented
BD0457 # 10 Y:2015 10 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $677 $500 Not Implemented
BD0457 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $889 $1,875 Not Implemented
BD0457 # 08 Y:2015 08 2015 INSTALL AUTOMATIC STACK DAMPER $791 $1,500 Not Implemented
BD0457 # 07 Y:2015 07 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $804 $900 Not Implemented
BD0457 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $927 $1,500 Not Implemented
BD0457 # 05 Y:2015 05 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,848 $5,000 Not Implemented
BD0457 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,863 $567 Implemented
BD0457 # 03 Y:2015 03 2015 USE RADIANT HEATER FOR SPOT HEATING $2,046 $3,300 Not Implemented
BD0457 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,919 $8,320 Implemented
UD0879 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $418 $0 Implemented
UD0879 # 02 Y:2013 02 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $677 $3,250 Not Implemented
UD0879 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $357 $1,000 Implemented
UD0879 # 04 Y:2013 04 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,298 $27,662 Implemented
UD0879 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $557 $2,440 Not Implemented
UD0879 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $307 $0 Implemented