IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 33331 Commercial and Service Industry Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0641 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,220 $3,400 Not Implemented
CO0641 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,910 $5,160 Not Implemented
CO0641 # 04 Y:2010 04 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $4,170 $31,500 Not Implemented
CO0641 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,610 $2,880 Not Implemented
CO0641 # 06 Y:2010 06 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,270 $35,500 Not Implemented
CO0641 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,300 $5,160 Not Implemented
CO0641 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $520 $810 Not Implemented
CO0641 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $320 $650 Not Implemented
CO0641 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,720 $410 Not Implemented
MA0661 # 06 Y:2010 06 2010 AIR CONDITION ONLY SPACE NECESSARY $2,526 $11,040 Implemented
MA0661 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $232 $260 Implemented
MA0661 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $707 $110 Implemented
MA0661 # 03 Y:2010 03 2010 REDUCE VENTILATION AIR $31,319 $17,008 Implemented
MA0661 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $562 $588 Implemented
MA0661 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $830 $200 Not Implemented
MA0660 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,601 $19,240 Not Implemented
MA0660 # 05 Y:2010 05 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $23,123 $0 Implemented
MA0660 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $58,587 $0 Implemented
MA0660 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,241 $0 Not Implemented
MA0660 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,403 $9,546 Implemented
SU0288 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,422 $0 Implemented
SU0288 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,730 $710 Implemented
SU0288 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,392 $2,257 Implemented
SU0288 # 04 Y:2010 04 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $50,239 $171,000 Implemented
SU0288 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $161 $729 Implemented