IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
NAICS 333314 Optical Instrument and Lens Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0624 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,033 $25,340 n/a
UF0624 # 03 Y:2024 03 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $11,217 $21,658 n/a
UF0624 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,280 $0 n/a
UF0624 # 08 Y:2024 08 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $23,221 $60,000 n/a
UF0624 # 07 Y:2024 07 2024 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $38,400 $100,000 n/a
UF0624 # 06 Y:2024 06 2024 UPGRADE CONTROLS ON COMPRESSORS $5,844 $6,000 n/a
UF0624 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $59,131 $322,608 n/a
UF0624 # 02 Y:2024 02 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $20,908 $14,359 n/a
CC0021 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,378 $25,947 n/a
CC0021 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $12,396 $15,000 n/a
CC0021 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,174 $0 n/a
CC0021 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,085 $35,000 n/a
CC0021 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,760 $0 n/a
CC0021 # 07 Y:2023 07 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,928 $5,000 n/a
CC0021 # 01 Y:2023 01 2023 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $50,657 $5,000 n/a
LE0527 # 06 Y:2022 06 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,260 $8,500 Not Implemented
LE0527 # 01 Y:2022 01 2022 PAY BILLS ON TIME TO AVOID LATE FEES $1,805 $0 Implemented
LE0527 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $103 $40 Not Implemented
LE0527 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,154 $160,000 Implemented
LE0527 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,621 $1,330 Implemented
LE0527 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,500 $3,435 Implemented
LE0527 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $32,527 $500,000 Implemented
SU0499 # 05 Y:2020 05 2020 ELIMINATE/REDUCE AN OPERATION $6,889 $11,879 Implemented
SU0499 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,223 $75,235 Implemented
SU0499 # 02 Y:2020 02 2020 REDUCE VENTILATION AIR $2,636 $882 Implemented