IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 3334 Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0306 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,099 $10,776 n/a
IC0306 # 03 Y:2024 03 2024 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,629 $118 n/a
IC0306 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,638 $33,160 n/a
IC0306 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $0 n/a
IC0306 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $432 n/a
IC0306 # 07 Y:2024 07 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,874 $10,418 n/a
IC0306 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $41,459 $20,803 n/a
IC0306 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $274,832 $1,429,458 n/a
MZ0270 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,293 $0 Implemented
MZ0270 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,893 $18,000 Implemented
MZ0270 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $235 $400 Not Implemented
MZ0270 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,815 $19,000 Not Implemented
MZ0270 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,149 $33,942 Implemented
MZ0270 # 02 Y:2019 02 2019 USE COMPRESSOR AIR FILTERS $737 $200 Implemented
MZ0270 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $760 $200 Implemented
IC0124 # 04 Y:2006 04 2006 INSTALL TIMERS AND/OR THERMOSTATS $6,565 $0 Not Implemented
IC0124 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,649 $1,500 Not Implemented
IC0124 # 06 Y:2006 06 2006 REPLACE BOILER $4,755 $27,175 Not Implemented
IC0124 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,031 $0 Not Implemented
IC0124 # 05 Y:2006 05 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $44,224 $56,250 Not Implemented
IC0124 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,585 $53,959 Implemented
IC0124 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,122 $180,000 Implemented
BD0260 # 04 Y:2004 04 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,159 $1,159 Implemented
BD0260 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,267 $656 Implemented
BD0260 # 09 Y:2004 09 2004 INSTALL AUTOMATIC STACK DAMPER $991 $1,500 Implemented