IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

958

matching recommendations
Reset
NAICS 3334 Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0157 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,149 $30,133 Implemented
MZ0157 # 04 Y:2014 04 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,223 $17,400 Not Implemented
MZ0157 # 05 Y:2014 05 2014 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,840 $9,600 Implemented
NC0524 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,264 $42,866 Implemented
NC0524 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,056 $100 Implemented
NC0524 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,368 $100 Implemented
NC0524 # 04 Y:2014 04 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,341 $29,000 Not Implemented
NC0524 # 05 Y:2014 05 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $606 $300 Implemented
NC0524 # 06 Y:2014 06 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,243 $475 Implemented
NC0524 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,355 $3,984 Implemented
NC0524 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $1,948 $3,644 Implemented
NC0524 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $160 Implemented
NC0524 # 10 Y:2014 10 2014 USE PHOTOCELL CONTROLS $54 $40 Implemented
NC0524 # 11 Y:2014 11 2014 REPAIR AND ELIMINATE STEAM LEAKS $1,126 $1,050 Implemented
NC0524 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $2,718 $8,146 Implemented
NC0524 # 13 Y:2014 13 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $818 $180 Implemented
TT0130 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $29,307 $44,000 Implemented
TT0130 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,560 $12,150 Implemented
TT0130 # 03 Y:2014 03 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,677 $4,500 Implemented
TT0130 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,047 $3,000 Not Implemented
TT0130 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,989 $20,000 Implemented
TT0130 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,191 $6,041 Implemented
OK0878 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,554 $1,400 Implemented
OK0878 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,459 $5,148 Implemented
OK0878 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,296 $1,222 Not Implemented