IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

958

matching recommendations
Reset
NAICS 33341 Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0809 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $3,160 $2,180 n/a
GT0809 # 06 Y:2005 06 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $8,596 $0 n/a
GT0809 # 07 Y:2005 07 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,741 $10,484 n/a
GT0809 # 08 Y:2005 08 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $305 $700 n/a
GT0809 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,388 $35,680 n/a
GT0809 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,948 $39,765 n/a
GT0809 # 11 Y:2005 11 2005 UPGRADE CONTROLS ON COMPRESSORS $10,500 $35,000 Not Implemented
GT0809 # 12 Y:2005 12 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,157 $102,196 Not Implemented
TA0095 # 01 Y:2005 01 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,820 $1,035 Not Implemented
TA0095 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $9,270 $2,660 Not Implemented
TA0095 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,300 $530 Implemented
TA0095 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,440 $2,000 Not Implemented
TA0095 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,615 $0 Not Implemented
TA0095 # 08 Y:2005 08 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $430 $0 Not Implemented
TA0095 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $0 Not Implemented
TA0095 # 06 Y:2005 06 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $270 $0 Not Implemented
SU0214 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $243 $0 Not Implemented
SU0214 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,788 $0 Implemented
SU0214 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,637 $0 Implemented
SU0214 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,167 $595 Implemented
SU0214 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,070 $1,125 Implemented
SU0214 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,629 $1,881 Not Implemented
AS0393 # 01 Y:2005 01 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $55,760 $2,000 Not Implemented
AS0393 # 02 Y:2005 02 2005 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $29,744 $15,000 Not Implemented
AS0393 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,557 $210 Implemented