IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

951

matching recommendations
Reset
NAICS 33341 Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0180 # 07 Y:2020 07 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $53,460 $2,400 Not Implemented
DL0180 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,080 $1,900 Implemented
DL0180 # 09 Y:2020 09 2020 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $610 $900 Implemented
GT0941 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $9,332 $1,450 Implemented
GT0941 # 02 Y:2020 02 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,493 $2,000 Not Implemented
GT0941 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,247 $2,500 Implemented
GT0941 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $6,947 $3,377 Not Implemented
GT0941 # 05 Y:2020 05 2020 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $6,583 $6,500 Not Implemented
GT0941 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,453 $25,191 Not Implemented
GT0941 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $659 $939 Implemented
GT0941 # 08 Y:2020 08 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $105,492 $696,247 Not Implemented
NC0647 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,099 $20,000 Not Implemented
NC0647 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $2,488 $5,708 Not Implemented
NC0647 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $192 $135 Not Implemented
NC0647 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,880 $5,000 Not Implemented
NC0647 # 05 Y:2020 05 2020 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $124,057 $600,000 Not Implemented
UK1906 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $483 $1,100 n/a
UK1906 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,725 $0 n/a
UK1906 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,355 $2,630 n/a
UK1906 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,341 $2,275 n/a
UK1906 # 05 Y:2019 05 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $288 $1,045 n/a
UK1906 # 06 Y:2019 06 2019 RECOVER WASTE HEAT FROM EQUIPMENT $1,304 $660 n/a
UK1906 # 07 Y:2019 07 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,766 $0 n/a
UK1906 # 08 Y:2019 08 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,392 $0 n/a
UK1906 # 09 Y:2019 09 2019 USE RADIANT HEATER FOR SPOT HEATING $8,769 $4,160 n/a