IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
NAICS 333413 Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0220 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,304 $80 Implemented
TT0220 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,534 $60 Implemented
MI0347 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,489 $5,529 Implemented
MI0347 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,870 $12,067 Implemented
MI0347 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,740 $2,923 Implemented
MI0347 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $5,404 $3,100 Implemented
MI0347 # 12 Y:2019 12 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $547 $480 Implemented
MI0347 # 11 Y:2019 11 2019 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,617 $1,707 Implemented
MZ0230 # 03 Y:2017 03 2017 MINIMIZE WATER USAGE $199 $30 Implemented
MZ0230 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $3,927 $1,050 Implemented
MZ0230 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,308 $0 Implemented
MZ0230 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,978 $27,450 Implemented
MZ0214 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,228 $1,100 Implemented
MZ0214 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $860 Implemented
MZ0214 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,834 $28,800 Implemented
NC0530 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $443 $200 Implemented
NC0530 # 03 Y:2014 03 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,962 $200 Implemented
NC0530 # 02 Y:2014 02 2014 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,055 $0 Implemented
NC0530 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $632 $176 Implemented
NC0530 # 14 Y:2014 14 2014 DEVELOP A REPAIR/REPLACE POLICY $2,001 $4,256 Implemented
NC0530 # 10 Y:2014 10 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $686 $563 Implemented
NC0530 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,623 $2,350 Implemented
OK0878 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,554 $1,400 Implemented
OK0878 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,905 $262 Implemented
OK0878 # 12 Y:2014 12 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,570 $55,638 Implemented