IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 333413 Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0530 # 14 Y:2014 14 2014 DEVELOP A REPAIR/REPLACE POLICY $2,001 $4,256 Implemented
NC0530 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $632 $176 Implemented
NC0530 # 10 Y:2014 10 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $686 $563 Implemented
NC0530 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,623 $2,350 Implemented
NC0530 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $443 $200 Implemented
NC0530 # 03 Y:2014 03 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,962 $200 Implemented
NC0530 # 02 Y:2014 02 2014 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,055 $0 Implemented
NC0497 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $13,386 $2,785 Implemented
NC0497 # 09 Y:2013 09 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $360 $650 Implemented
NC0497 # 08 Y:2013 08 2013 DEVELOP A REPAIR/REPLACE POLICY $3,513 $4,256 Implemented
NC0497 # 07 Y:2013 07 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,053 $513 Implemented
NC0497 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,827 $11,647 Implemented
NC0497 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,761 $100 Implemented
NC0497 # 01 Y:2013 01 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,740 $70,400 Implemented
NC0434 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,138 $2,127 Implemented
NC0434 # 09 Y:2011 09 2011 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $1,039 $876 Implemented
NC0434 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $10,660 Implemented
NC0434 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,609 $32,453 Implemented
NC0434 # 06 Y:2011 06 2011 COVER OPEN TANKS $414 $908 Implemented
NC0434 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142 $100 Implemented
NC0434 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,424 $1,000 Implemented
NC0434 # 02 Y:2011 02 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,152 $14,895 Implemented