Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
248
matching recommendationsNAICS | 333413 | Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1087 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $684 | $0 | n/a |
UD1087 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,975 | $0 | n/a |
UD1087 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $399 | $1,254 | n/a |
UD1087 # 08 Y:2024 | 08 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $601 | $2,093 | n/a |
UD1087 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $452 | $487 | n/a |
UD1087 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,614 | $6,258 | n/a |
UD1087 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,335 | $1,068 | n/a |
UD1087 # 07 Y:2024 | 07 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $303 | $900 | n/a |
UL2313 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,515 | $14,625 | n/a |
UL2313 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,325 | $2,880 | n/a |
UL2313 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $95,755 | $917,406 | n/a |
UL2313 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,566 | $0 | n/a |
UL2313 # 06 Y:2023 | 06 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,989 | $15,000 | n/a |
UL2313 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,411 | $30,977 | n/a |
UL2310 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $145,022 | $23,878 | n/a |
UL2310 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,694 | $540 | n/a |
UL2310 # 02 Y:2023 | 02 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,283 | $0 | n/a |
UL2310 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $550 | $2,438 | n/a |
UL2310 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,462 | $0 | n/a |
UL2310 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $159,497 | $1,065,693 | n/a |
CI0009 # 07 Y:2023 | 07 | 2023 | USE PHOTOCELL CONTROLS | $4,055 | $2,500 | n/a |
CI0009 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $4,832 | $4,725 | n/a |
CI0009 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,574 | $0 | n/a |
CI0009 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,281 | $14,880 | n/a |
CI0009 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,199 | $1,500 | n/a |