Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
248
matching recommendationsNAICS | 333413 | Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0862 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,426 | $53,400 | Not Implemented |
OK0862 # 06 Y:2013 | 06 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,177 | $8,000 | Not Implemented |
OK0862 # 07 Y:2013 | 07 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,599 | $12,000 | Not Implemented |
OK0817 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,438 | $510 | Implemented |
OK0817 # 02 Y:2011 | 02 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,812 | $1,220 | Not Implemented |
OK0817 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,613 | $2,745 | Not Implemented |
OK0817 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $728 | $2,751 | Not Implemented |
OK0817 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,469 | $55,540 | Not Implemented |
OK0817 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,965 | $47,375 | Not Implemented |
OK0817 # 07 Y:2011 | 07 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,011 | $23,400 | Implemented |
OK0817 # 08 Y:2011 | 08 | 2011 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $2,546 | $12,837 | Not Implemented |
OK0817 # 09 Y:2011 | 09 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,450 | $4,260 | Not Implemented |
OK0817 # 10 Y:2011 | 10 | 2011 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,371 | $0 | Implemented |
TT0077 # 01 Y:2011 | 01 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $610 | $0 | Not Implemented |
TT0077 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $472 | $0 | Not Implemented |
TT0077 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,334 | $7,975 | Not Implemented |
TT0077 # 04 Y:2011 | 04 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $990 | $5,400 | Not Implemented |
TT0077 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,757 | $80,684 | Not Implemented |
TT0077 # 06 Y:2011 | 06 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,806 | $18,000 | Not Implemented |
NC0434 # 01 Y:2011 | 01 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,138 | $2,127 | Implemented |
NC0434 # 02 Y:2011 | 02 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,152 | $14,895 | Implemented |
NC0434 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,424 | $1,000 | Implemented |
NC0434 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $142 | $100 | Implemented |
NC0434 # 05 Y:2011 | 05 | 2011 | REPLACE BOILER | $5,957 | $26,400 | Not Implemented |
NC0434 # 06 Y:2011 | 06 | 2011 | COVER OPEN TANKS | $414 | $908 | Implemented |