Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
111
matching recommendationsNAICS | 333413 | Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0497 # 06 Y:2013 | 06 | 2013 | USE PHOTOCELL CONTROLS | $2,032 | $120 | Not Implemented |
NC0497 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,827 | $11,647 | Implemented |
NC0497 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,761 | $100 | Implemented |
NC0497 # 07 Y:2013 | 07 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,053 | $513 | Implemented |
NC0497 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $13,386 | $2,785 | Implemented |
NC0497 # 01 Y:2013 | 01 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,740 | $70,400 | Implemented |
NC0497 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,793 | $2,250 | Not Implemented |
NC0497 # 09 Y:2013 | 09 | 2013 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $360 | $650 | Implemented |
NC0497 # 08 Y:2013 | 08 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $3,513 | $4,256 | Implemented |
OK0862 # 07 Y:2013 | 07 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,599 | $12,000 | Not Implemented |
OK0862 # 06 Y:2013 | 06 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,177 | $8,000 | Not Implemented |
OK0862 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,426 | $53,400 | Not Implemented |
OK0862 # 04 Y:2013 | 04 | 2013 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $600 | $0 | Not Implemented |
OK0862 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $3,000 | $2,520 | Implemented |
OK0862 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,745 | $52,650 | Not Implemented |
OK0862 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,733 | $0 | Implemented |
OK0817 # 08 Y:2011 | 08 | 2011 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $2,546 | $12,837 | Not Implemented |
OK0817 # 07 Y:2011 | 07 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,011 | $23,400 | Implemented |
OK0817 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,438 | $510 | Implemented |
OK0817 # 02 Y:2011 | 02 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,812 | $1,220 | Not Implemented |
OK0817 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,613 | $2,745 | Not Implemented |
OK0817 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,965 | $47,375 | Not Implemented |
OK0817 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,469 | $55,540 | Not Implemented |
OK0817 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $728 | $2,751 | Not Implemented |
OK0817 # 10 Y:2011 | 10 | 2011 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,371 | $0 | Implemented |