Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

237

matching recommendations
Reset
NAICS 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0692 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,239 $2,275 Implemented
OK0692 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,221 $8,625 Implemented
OK0692 # 06 Y:2004 06 2004 INSTALL SET-BACK TIMERS $81,447 $10,000 Implemented
OK0692 # 07 Y:2004 07 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $8,800 $0 Implemented
OK0692 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,577 $11,882 Implemented
OK0691 # 02 Y:2004 02 2004 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $270,439 $2,825 Implemented
OK0691 # 03 Y:2004 03 2004 INSTALL SET-BACK TIMERS $6,531 $3,832 Implemented
OK0691 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,036 $559 Implemented
OK0691 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $265 $0 Implemented
OK0691 # 07 Y:2004 07 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $886 $139 Implemented
OK0689 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,079 $2,156 Implemented
OK0689 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,433 $252 Implemented
BD0260 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,265 $0 Implemented
BD0260 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,158 $900 Implemented
BD0260 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $5,118 $6,900 Implemented
BD0260 # 04 Y:2004 04 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,159 $1,159 Implemented
BD0260 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,427 $3,000 Implemented
BD0260 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,226 $1,000 Implemented
BD0260 # 07 Y:2004 07 2004 INSTALL TURBULATORS $1,553 $3,500 Implemented
BD0260 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,267 $656 Implemented
BD0260 # 09 Y:2004 09 2004 INSTALL AUTOMATIC STACK DAMPER $991 $1,500 Implemented
BD0260 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $547 $551 Implemented
BD0260 # 11 Y:2004 11 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $312 $670 Implemented
BD0260 # 12 Y:2004 12 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $377 $1,000 Implemented
BD0260 # 13 Y:2004 13 2004 USE POWER DURING OFF-PEAK PERIODS $1,766 $0 Implemented