IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

570

matching recommendations
Reset
NAICS 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0864 # 01 Y:2009 01 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,717 $0 Not Implemented
GT0864 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,440 $3,700 Not Implemented
GT0864 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $17,020 $31,520 Not Implemented
GT0864 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,083 $90,000 Not Implemented
GT0864 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,718 $61,839 Not Implemented
GT0864 # 06 Y:2009 06 2009 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $17,955 $22,473 Not Implemented
GT0864 # 07 Y:2009 07 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $56,030 $107,040 Not Implemented
MA0644 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $34,492 $160,000 Implemented
MA0644 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,900 $0 Implemented
MA0644 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $11,580 $25,000 Implemented
MA0644 # 04 Y:2009 04 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,097 $37,500 Not Implemented
MA0644 # 05 Y:2009 05 2009 REDUCE VENTILATION AIR $6,015 $2,600 Implemented
MA0644 # 06 Y:2009 06 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,937 $0 Implemented
GT0858 # 01 Y:2008 01 2008 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,046 $0 Implemented
GT0858 # 02 Y:2008 02 2008 Equipment Scheduling $5,630 $0 Not Implemented
GT0858 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $16,189 $33,180 Implemented
GT0858 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,485 $4,500 Implemented
GT0858 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,063 $10,879 Implemented
GT0858 # 06 Y:2008 06 2008 USE SOLAR HEAT TO HEAT WATER $3,687 $7,500 Not Implemented
GT0858 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $475 $900 Not Implemented
GT0858 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,520 $5,835 Not Implemented
UF0411 # 01 Y:2008 01 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,719 $4,557 Not Implemented
UF0411 # 02 Y:2008 02 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $47,620 $6,301 Not Implemented
UF0411 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,287 $40,292 Implemented
UF0411 # 04 Y:2008 04 2008 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,258 $461 Implemented