Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
570
matching recommendationsNAICS | 333415 | Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0809 # 06 Y:2005 | 06 | 2005 | ADJUST BURNERS FOR EFFICIENT OPERATION | $8,596 | $0 | n/a |
GT0809 # 07 Y:2005 | 07 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,741 | $10,484 | n/a |
GT0809 # 08 Y:2005 | 08 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $305 | $700 | n/a |
GT0809 # 09 Y:2005 | 09 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,388 | $35,680 | n/a |
GT0809 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,948 | $39,765 | n/a |
GT0809 # 11 Y:2005 | 11 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $10,500 | $35,000 | Not Implemented |
GT0809 # 12 Y:2005 | 12 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,157 | $102,196 | Not Implemented |
TA0095 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,820 | $1,035 | Not Implemented |
TA0095 # 02 Y:2005 | 02 | 2005 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $9,270 | $2,660 | Not Implemented |
TA0095 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,300 | $530 | Implemented |
TA0095 # 04 Y:2005 | 04 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,440 | $2,000 | Not Implemented |
TA0095 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,615 | $0 | Not Implemented |
TA0095 # 06 Y:2005 | 06 | 2005 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $270 | $0 | Not Implemented |
TA0095 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,370 | $0 | Not Implemented |
TA0095 # 08 Y:2005 | 08 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $430 | $0 | Not Implemented |
AS0393 # 01 Y:2005 | 01 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $55,760 | $2,000 | Not Implemented |
AS0393 # 02 Y:2005 | 02 | 2005 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $29,744 | $15,000 | Not Implemented |
AS0393 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,557 | $210 | Implemented |
AS0393 # 04 Y:2005 | 04 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,674 | $5,500 | Not Implemented |
AS0393 # 05 Y:2005 | 05 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,250 | $12,278 | Implemented |
AS0393 # 06 Y:2005 | 06 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,527 | $70 | Implemented |
AS0393 # 07 Y:2005 | 07 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,152 | $1,260 | Implemented |
AS0393 # 08 Y:2005 | 08 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $968 | $3,000 | Implemented |
AS0393 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $324 | $350 | Not Implemented |
AS0393 # 10 Y:2005 | 10 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $108 | $224 | Implemented |