Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsNAICS | 333415 | Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0661 # 09 Y:2003 | 09 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $11,440 | $2,500 | Implemented |
OK0661 # 08 Y:2003 | 08 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,061 | $45,000 | Implemented |
OK0661 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $441 | $262 | Not Implemented |
OK0661 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $72,173 | $0 | Not Implemented |
OK0661 # 02 Y:2003 | 02 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $20,400 | $0 | Implemented |
OK0661 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,245 | $7,483 | Not Implemented |
OK0661 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,319 | $823 | Implemented |
OK0661 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $1,271 | $3,206 | Not Implemented |
OK0661 # 06 Y:2003 | 06 | 2003 | USE COMPRESSOR AIR FILTERS | $3,339 | $168 | Not Implemented |
MS0221 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,072 | $12,006 | Not Implemented |
MS0221 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $460 | $585 | Not Implemented |
MS0221 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,834 | $782 | Implemented |
MS0221 # 01 Y:2003 | 01 | 2003 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $202,950 | $8,100 | Implemented |
SU0153 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $57,642 | $93,355 | Implemented |
SU0153 # 02 Y:2003 | 02 | 2003 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $42,094 | $93,819 | Not Implemented |
SU0153 # 03 Y:2003 | 03 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $30,876 | $11,602 | Implemented |
SU0153 # 04 Y:2003 | 04 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $12,993 | $7,176 | Not Implemented |
SU0153 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,229 | $438 | Implemented |
SU0153 # 06 Y:2003 | 06 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,043 | $16,501 | Implemented |
SU0153 # 07 Y:2003 | 07 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $4,900 | $16,700 | Implemented |
SU0153 # 08 Y:2003 | 08 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,098 | $12,105 | Not Implemented |
SU0153 # 09 Y:2003 | 09 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,467 | $163 | Implemented |
SU0153 # 10 Y:2003 | 10 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $882 | $249 | Not Implemented |