IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0103 # 02 Y:2013 02 2013 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $25,000 $45,000 Implemented
DL0103 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $28,900 $200 Implemented
DL0103 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $14,700 $100 Implemented
DL0103 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,606 $440 Not Implemented
DL0103 # 06 Y:2013 06 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,746 $4,200 Not Implemented
DL0103 # 07 Y:2013 07 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,364 $180 Not Implemented
DL0103 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $2,200 $100 Implemented
DL0103 # 09 Y:2013 09 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,150 $494 Implemented
DL0103 # 01 Y:2013 01 2013 REDUCE VENTILATION AIR $59,100 $250,000 Not Implemented
SD0463 # 07 Y:2013 07 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $467 $200 Not Implemented
SD0463 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $564 $200 Not Implemented
SD0463 # 05 Y:2013 05 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,233 $5,250 Not Implemented
SD0463 # 04 Y:2013 04 2013 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,768 $2,210 Implemented
SD0463 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $2,625 $1,850 Not Implemented
SD0463 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,131 $6,224 Not Implemented
SD0463 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,304 $1,500 Not Implemented
OK0842 # 08 Y:2013 08 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,801 $21,780 Implemented
OK0842 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $24,000 $1,708 Not Implemented
OK0842 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,770 $5,000 Implemented
OK0842 # 11 Y:2013 11 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,138 $7,536 Not Implemented
OK0842 # 12 Y:2013 12 2013 OPTIMIZE PLANT POWER FACTOR $18,213 $10,212 Not Implemented
OK0842 # 13 Y:2013 13 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $32,965 $56,937 Not Implemented
OK0842 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,837 $5,254 Not Implemented
OK0842 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $664 $5,625 Not Implemented
OK0842 # 05 Y:2013 05 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $242,685 $1,298,400 Not Implemented