Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
311
matching recommendationsNAICS | 333415 | Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0103 # 01 Y:2013 | 01 | 2013 | REDUCE VENTILATION AIR | $59,100 | $250,000 | Not Implemented |
DL0103 # 06 Y:2013 | 06 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,746 | $4,200 | Not Implemented |
DL0103 # 07 Y:2013 | 07 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,364 | $180 | Not Implemented |
DL0103 # 08 Y:2013 | 08 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,200 | $100 | Implemented |
DL0103 # 02 Y:2013 | 02 | 2013 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $25,000 | $45,000 | Implemented |
DL0103 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $28,900 | $200 | Implemented |
DL0103 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,700 | $100 | Implemented |
DL0103 # 09 Y:2013 | 09 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $1,150 | $494 | Implemented |
DL0103 # 05 Y:2013 | 05 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,606 | $440 | Not Implemented |
SD0463 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $564 | $200 | Not Implemented |
SD0463 # 05 Y:2013 | 05 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,233 | $5,250 | Not Implemented |
SD0463 # 03 Y:2013 | 03 | 2013 | USE PHOTOCELL CONTROLS | $2,625 | $1,850 | Not Implemented |
SD0463 # 07 Y:2013 | 07 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $467 | $200 | Not Implemented |
SD0463 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,304 | $1,500 | Not Implemented |
SD0463 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,131 | $6,224 | Not Implemented |
SD0463 # 04 Y:2013 | 04 | 2013 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,768 | $2,210 | Implemented |
OK0842 # 01 Y:2013 | 01 | 2013 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $21,170 | $53,000 | Not Implemented |
OK0842 # 08 Y:2013 | 08 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,801 | $21,780 | Implemented |
OK0842 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,837 | $5,254 | Not Implemented |
OK0842 # 04 Y:2013 | 04 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $7,057 | $128,411 | Implemented |
OK0842 # 11 Y:2013 | 11 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,138 | $7,536 | Not Implemented |
OK0842 # 03 Y:2013 | 03 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $52,815 | $21,105 | Implemented |
OK0842 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,770 | $5,000 | Implemented |
OK0842 # 09 Y:2013 | 09 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,000 | $1,708 | Not Implemented |
OK0842 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $664 | $5,625 | Not Implemented |