Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
800
matching recommendationsNAICS | 3335 | Metalworking Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0356 # 15 Y:2007 | 15 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $504 | $270 | Implemented |
WV0356 # 16 Y:2007 | 16 | 2007 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $499 | $280 | Not Implemented |
WV0356 # 17 Y:2007 | 17 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $488 | $40 | Implemented |
TA0128 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,981 | $1,440 | Not Implemented |
TA0128 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,627 | $1,030 | Not Implemented |
TA0128 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $52,032 | $10,650 | Not Implemented |
TA0128 # 04 Y:2006 | 04 | 2006 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,927 | $0 | Not Implemented |
WV0337 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,554 | $123,600 | Implemented |
WV0337 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,455 | $800 | Implemented |
WV0337 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $5,170 | $2,156 | Implemented |
WV0337 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,690 | $0 | Implemented |
WV0337 # 05 Y:2006 | 05 | 2006 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,170 | $2,350 | Not Implemented |
WV0337 # 06 Y:2006 | 06 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $2,233 | $760 | Implemented |
WV0337 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,082 | $590 | Implemented |
WV0337 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,981 | $80 | Implemented |
WV0337 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,846 | $2,185 | Not Implemented |
WV0337 # 10 Y:2006 | 10 | 2006 | USE SYNTHETIC LUBRICANT | $1,777 | $0 | Implemented |
WV0337 # 11 Y:2006 | 11 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,749 | $2,400 | Not Implemented |
WV0337 # 12 Y:2006 | 12 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,100 | $1,308 | Not Implemented |
WV0337 # 13 Y:2006 | 13 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $674 | $1,280 | Implemented |
UD0738 # 01 Y:2006 | 01 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $91,800 | $6,000 | Implemented |
UD0738 # 02 Y:2006 | 02 | 2006 | RECOVER AND REUSE WASTE MATERIAL | $28,944 | $2,000 | Not Implemented |
UD0738 # 03 Y:2006 | 03 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $8,313 | $0 | Implemented |
UD0738 # 04 Y:2006 | 04 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,084 | $0 | Implemented |
UD0738 # 05 Y:2006 | 05 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,819 | $0 | Not Implemented |