IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 3335 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0202 # 05 Y:2016 05 2016 UPGRADE CONTROLS ON COMPRESSORS $9,678 $45,000 Not Implemented
MZ0202 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $3,839 $3,225 Not Implemented
MZ0202 # 07 Y:2016 07 2016 CONDENSE OPERATION INTO ONE BUILDING $7,503 $0 Not Implemented
MZ0202 # 06 Y:2016 06 2016 CONDENSE OPERATION INTO ONE BUILDING $3,585 $0 Not Implemented
MZ0202 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,654 $5,000 Not Implemented
MZ0202 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,180 $27,600 Not Implemented
MZ0202 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $19,101 $70,000 Not Implemented
MZ0202 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,722 $7,341 Not Implemented
MZ0142 # 06 Y:2014 06 2014 USE PHOTOCELL CONTROLS $1,432 $980 Not Implemented
MZ0142 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,435 $31,000 Implemented
MZ0142 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $206 $720 Not Implemented
MZ0142 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,716 $2,500 Not Implemented
MZ0142 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $505 $1,000 Not Implemented
MZ0142 # 01 Y:2014 01 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $5,862 $6,500 Not Implemented
MZ0059 # 09 Y:2010 09 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $24,000 $0 Implemented
MZ0059 # 10 Y:2010 10 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,000 $15,000 Implemented
MZ0059 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,816 $6,000 Implemented
MZ0059 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $856 $0 Not Implemented
MZ0059 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,304 $660 Implemented
MZ0059 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,039 $4,580 Implemented
MZ0059 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,793 $4,200 Implemented
MZ0059 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $662 $560 Not Implemented
MZ0059 # 02 Y:2010 02 2010 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,628 $1,000 Implemented
MZ0059 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $246 $100 Implemented
MZ0038 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $600 $178 Implemented