IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68

matching recommendations
Reset
NAICS 3335 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0088 # 01 Y:2004 01 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,664 $0 Implemented
IC0088 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,547 $400 Implemented
IC0088 # 04 Y:2004 04 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,021 $21,693 Not Implemented
IC0088 # 05 Y:2004 05 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $505 $1,420 Not Implemented
IC0088 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,563 $459 Implemented
IC0088 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,571 $20,087 Not Implemented
WI0479 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,122 $11,520 n/a
WI0479 # 01 Y:2004 01 2004 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $16,108 $12,000 Not Implemented
WI0479 # 02 Y:2004 02 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,744 $18,000 Not Implemented
WI0479 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,022 $0 Implemented
WI0479 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $670 $640 Not Implemented
WI0479 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $667 $1,020 Not Implemented
WI0479 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,186 $774 Not Implemented
WI0479 # 04 Y:2004 04 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,229 $0 Not Implemented
UD0705 # 02 Y:2004 02 2004 DEVELOP STANDARD OPERATING PROCEDURES $23,264 $30,000 Not Implemented
UD0705 # 01 Y:2004 01 2004 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $50,000 $50,000 Implemented
UD0705 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,980 $0 Not Implemented
UD0705 # 03 Y:2004 03 2004 REDUCE SCRAP PRODUCTION $12,990 $0 Implemented
UD0705 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,260 $1,722 Not Implemented
UD0705 # 09 Y:2004 09 2004 UPGRADE CONTROLS ON COMPRESSORS $1,214 $0 Implemented
UD0705 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,816 $10,800 Not Implemented
UD0705 # 11 Y:2004 11 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $83 $0 Implemented
UD0705 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,683 $0 Implemented
UD0705 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,195 $304 Not Implemented
UD0705 # 10 Y:2004 10 2004 COVER OPEN TANKS $710 $0 Implemented