IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 3335 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0374 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $161 $615 Not Implemented
SU0374 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,433 $39,216 Not Implemented
SU0374 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $379 $276 Implemented
SU0374 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,770 $2,000 Implemented
SU0374 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $5,979 $616 Not Implemented
SU0374 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,507 $0 Not Implemented
SU0374 # 06 Y:2014 06 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $931 $2,604 Implemented
CO0694 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,790 $1,500 Not Implemented
CO0694 # 03 Y:2014 03 2014 USE PHOTOCELL CONTROLS $3,870 $7,930 Not Implemented
CO0694 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,480 $9,250 Not Implemented
CO0694 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,630 $470 Not Implemented
SD0485 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,720 $5,000 Implemented
SD0485 # 03 Y:2014 03 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $25,053 $91,900 Implemented
SD0485 # 04 Y:2014 04 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,807 $28,125 Implemented
SD0485 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,114 $1,000 Implemented
SD0485 # 06 Y:2014 06 2014 USE PHOTOCELL CONTROLS $1,975 $5,550 Implemented
SD0485 # 07 Y:2014 07 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,832 $4,400 Implemented
SD0485 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $117,088 $25,225 Not Implemented
MZ0142 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $505 $1,000 Not Implemented
MZ0142 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,716 $2,500 Not Implemented
MZ0142 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $206 $720 Not Implemented
MZ0142 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,435 $31,000 Implemented
MZ0142 # 06 Y:2014 06 2014 USE PHOTOCELL CONTROLS $1,432 $980 Not Implemented
MZ0142 # 01 Y:2014 01 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $5,862 $6,500 Not Implemented
MA0728 # 02 Y:2014 02 2014 REPLACE BOILER $10,114 $30,450 Implemented