IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 33351 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0214 # 14 Y:2025 14 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,911 $51,915 n/a
IP0214 # 13 Y:2025 13 2025 REPLACE BOILER $29,619 $95,000 n/a
IP0214 # 12 Y:2025 12 2025 STANDARDIZE MOTOR INVENTORY $23,673 $53,888 n/a
IP0214 # 11 Y:2025 11 2025 RECOVER WASTE HEAT FROM EQUIPMENT $2,076 $3,485 n/a
IP0214 # 01 Y:2025 01 2025 CONVERT TO ELECTROSTATIC POWDER COATING $114,298 $0 n/a
IP0214 # 02 Y:2025 02 2025 DEVELOP A REPAIR/REPLACE POLICY $2,655 $0 n/a
IP0214 # 03 Y:2025 03 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,561 $243 n/a
IP0214 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,034 $3,500 n/a
IP0214 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,935 $2,485 n/a
IP0214 # 06 Y:2025 06 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,932 $646 n/a
IP0214 # 07 Y:2025 07 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $562,500 $561,997 n/a
IP0214 # 08 Y:2025 08 2025 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $9,428 $9,599 n/a
IP0214 # 09 Y:2025 09 2025 USE RADIANT HEATER FOR SPOT HEATING $9,756 $12,559 n/a
IP0214 # 10 Y:2025 10 2025 UPGRADE CONVEYORS $4,792 $7,500 n/a
IC0199 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,264 $4,650 Not Implemented
IC0199 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,586 $4,651 Not Implemented
IC0199 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,064 $50 Not Implemented
IC0199 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,101 $1,146 Not Implemented
IC0199 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,964 $3,000 Not Implemented
BD0439 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $341 $350 Implemented
BD0439 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,900 $1,000 Implemented
BD0439 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $400 $20 Implemented
BD0439 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $535 $395 Not Implemented
BD0439 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $813 $795 Implemented
BD0439 # 04 Y:2013 04 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,797 $3,310 Not Implemented