IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

800

matching recommendations
Reset
NAICS 33351 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0011 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,063 $440 Implemented
WM0011 # 03 Y:2012 03 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $293 $265 Implemented
WM0011 # 04 Y:2012 04 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $899 $1,480 Not Implemented
WM0011 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $406 $600 Not Implemented
WM0011 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $357 $0 Not Implemented
WM0011 # 07 Y:2012 07 2012 USE A RAG RECYCLE SERVICE $2,496 $0 Not Implemented
WM0011 # 08 Y:2012 08 2012 COMBINE UTILITY METERS $1,110 $5,000 Not Implemented
WM0011 # 09 Y:2012 09 2012 IMPROVE SPACE COMFORT CONDITIONING $2,993 $3,000 Implemented
MAS029 # 01 Y:2012 01 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,149 $500 Implemented
MAS029 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,915 $22,500 Not Implemented
MAS029 # 03 Y:2012 03 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,202 $22,100 Not Implemented
MAS029 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,313 $4,270 Implemented
MAS029 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,392 $0 Implemented
MAS029 # 06 Y:2012 06 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,176 $3,920 Not Implemented
AM0608 # 01 Y:2012 01 2012 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,383,679 $251,064 Implemented
AM0608 # 02 Y:2012 02 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $90,500 $180,000 Not Implemented
AM0608 # 03 Y:2012 03 2012 RECOVER AND REUSE WASTE MATERIAL $144,150 $85,000 Implemented
AM0608 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,200 $124,000 Implemented
AM0608 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $12,691 $3,566 Not Implemented
AM0608 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,360 $65 Not Implemented
AM0608 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,900 $1,625 Implemented
BD0407 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,152 $4,550 Implemented
BD0407 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,651 $2,474 Implemented
BD0407 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $2,441 $1,125 Not Implemented
BD0407 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,629 $10 Not Implemented