IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
NAICS 33351 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0630 # 08 Y:2023 08 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,832 $1,080 Implemented
SD0630 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,113 $3,606 Implemented
SD0630 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,881 $57,222 Implemented
SD0630 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,049 $13,269 Implemented
SD0630 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,850 $9,294 Implemented
SD0630 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $598 $500 Implemented
SD0630 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $664 $1,500 Implemented
SD0630 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,064 $7,542 Implemented
SD0485 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $117,088 $25,225 Not Implemented
SD0485 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,720 $5,000 Implemented
SD0485 # 03 Y:2014 03 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $25,053 $91,900 Implemented
SD0485 # 04 Y:2014 04 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,807 $28,125 Implemented
SD0485 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,114 $1,000 Implemented
SD0485 # 06 Y:2014 06 2014 USE PHOTOCELL CONTROLS $1,975 $5,550 Implemented
SD0485 # 07 Y:2014 07 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,832 $4,400 Implemented
SD0420 # 01 Y:2009 01 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $685 $0 Implemented
SD0420 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,131 $3,573 Not Implemented
SD0420 # 04 Y:2009 04 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,037 $3,000 Not Implemented
SD0420 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $383 $246 Not Implemented
SD0420 # 03 Y:2009 03 2009 USE PHOTOCELL CONTROLS $3,350 $4,950 Not Implemented
SD0372 # 09 Y:2005 09 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,612 $784 Not Implemented
SD0372 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,592 $688 Not Implemented
SD0372 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,723 $16,563 Implemented
SD0372 # 01 Y:2005 01 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,522 $12,000 Not Implemented
SD0372 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,816 $2,580 Not Implemented