Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsNAICS | 33351 | Metalworking Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0041 # 02 Y:2022 | 02 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $28,659 | $27,941 | Implemented |
TR0041 # 03 Y:2022 | 03 | 2022 | UPGRADE OBSOLETE EQUIPMENT | $17,496 | $200,000 | Implemented |
TR0041 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,679 | $3,857 | Implemented |
AM0608 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,900 | $1,625 | Implemented |
AM0608 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,200 | $124,000 | Implemented |
AM0608 # 03 Y:2012 | 03 | 2012 | RECOVER AND REUSE WASTE MATERIAL | $144,150 | $85,000 | Implemented |
AM0608 # 01 Y:2012 | 01 | 2012 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,383,679 | $251,064 | Implemented |
AM0608 # 02 Y:2012 | 02 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $90,500 | $180,000 | Not Implemented |
AM0608 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,360 | $65 | Not Implemented |
AM0608 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $12,691 | $3,566 | Not Implemented |
TA0128 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $52,032 | $10,650 | Not Implemented |
TA0128 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,981 | $1,440 | Not Implemented |
TA0128 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,627 | $1,030 | Not Implemented |
TA0128 # 04 Y:2006 | 04 | 2006 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,927 | $0 | Not Implemented |
TA0112 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $730 | $755 | Not Implemented |
TA0112 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $17,967 | $1,359 | Not Implemented |
TA0112 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,372 | $3,492 | Not Implemented |
TA0112 # 03 Y:2006 | 03 | 2006 | INSTALL AUTOMATIC PACKING EQUIPMENT | $4,082 | $7,614 | Not Implemented |
TA0112 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,463 | $792 | Not Implemented |
TA0103 # 05 Y:2005 | 05 | 2005 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $700 | $1,070 | Implemented |
TA0103 # 02 Y:2005 | 02 | 2005 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,365 | $2,620 | Implemented |
TA0103 # 01 Y:2005 | 01 | 2005 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $12,460 | $8,170 | Not Implemented |
TA0103 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,990 | $0 | Implemented |
TA0103 # 03 Y:2005 | 03 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $14,113 | $0 | Implemented |
AM0467 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,000 | $6 | Implemented |