Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
188
matching recommendationsNAICS | 333511 | Industrial Mold Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0437 # 08 Y:2013 | 08 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,177 | $4,660 | Not Implemented |
UM0437 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,430 | $510 | Implemented |
UM0437 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,700 | $5,700 | Implemented |
UM0437 # 05 Y:2013 | 05 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,000 | $2,500 | Not Implemented |
UM0437 # 04 Y:2013 | 04 | 2013 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $11,900 | $5,000 | Not Implemented |
UM0437 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,400 | $10,000 | Not Implemented |
UM0437 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,400 | $200 | Not Implemented |
UM0437 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $11,350 | $4,000 | Implemented |
MAS029 # 03 Y:2012 | 03 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $8,202 | $22,100 | Not Implemented |
MAS029 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,313 | $4,270 | Implemented |
MAS029 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,392 | $0 | Implemented |
MAS029 # 06 Y:2012 | 06 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,176 | $3,920 | Not Implemented |
MAS029 # 01 Y:2012 | 01 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,149 | $500 | Implemented |
MAS029 # 02 Y:2012 | 02 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $12,915 | $22,500 | Not Implemented |
IC0177 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $252 | $1,520 | Not Implemented |
IC0177 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $150 | $1 | Not Implemented |
IC0177 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $206 | $1 | Implemented |
IC0177 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,982 | $15,752 | Implemented |
IC0177 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $667 | $212 | Not Implemented |
IC0177 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $1,091 | $3,544 | Not Implemented |
UM0371 # 02 Y:2010 | 02 | 2010 | OPTIMIZE PLANT POWER FACTOR | $60,000 | $50,000 | Implemented |
UM0371 # 07 Y:2010 | 07 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,530 | $300,000 | Not Implemented |
UM0371 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,475 | $3,500 | Implemented |
UM0371 # 04 Y:2010 | 04 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $4,729 | $10 | Implemented |
UM0371 # 01 Y:2010 | 01 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $70,732 | $1,319,976 | Implemented |