Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
128
matching recommendationsNAICS | 333515 | Cutting Tool and Machine Tool Accessory Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0746 # 01 Y:2015 | 01 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $14,457 | $7,354 | Implemented |
MA0746 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,017 | $88,800 | Implemented |
MA0746 # 03 Y:2015 | 03 | 2015 | REDUCE VENTILATION AIR | $13,483 | $3,785 | Implemented |
MA0746 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,070 | $2,100 | Implemented |
MA0746 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,299 | $3,000 | Implemented |
MA0746 # 06 Y:2015 | 06 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $2,323 | $362 | Implemented |
MA0746 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,874 | $2,960 | Implemented |
BD0439 # 01 Y:2013 | 01 | 2013 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $6,296 | $50 | Implemented |
BD0439 # 02 Y:2013 | 02 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $4,775 | $6,000 | Not Implemented |
BD0439 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,900 | $1,000 | Implemented |
BD0439 # 04 Y:2013 | 04 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,797 | $3,310 | Not Implemented |
BD0439 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $813 | $795 | Implemented |
BD0439 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $535 | $395 | Not Implemented |
BD0439 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $400 | $20 | Implemented |
BD0439 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $341 | $350 | Implemented |
BD0439 # 09 Y:2013 | 09 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $293 | $300 | Not Implemented |
TT0103 # 01 Y:2012 | 01 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,502 | $0 | Implemented |
TT0103 # 02 Y:2012 | 02 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,152 | $35,480 | Not Implemented |
TT0103 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,318 | $5,300 | Implemented |
TT0103 # 04 Y:2012 | 04 | 2012 | STANDARDIZE MOTOR INVENTORY | $0 | $0 | Not Implemented |
TT0103 # 05 Y:2012 | 05 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $35,332 | $1,960 | Not Implemented |
AM0608 # 01 Y:2012 | 01 | 2012 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,383,679 | $251,064 | Implemented |
AM0608 # 02 Y:2012 | 02 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $90,500 | $180,000 | Not Implemented |
AM0608 # 03 Y:2012 | 03 | 2012 | RECOVER AND REUSE WASTE MATERIAL | $144,150 | $85,000 | Implemented |
AM0608 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,200 | $124,000 | Implemented |