IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

282

matching recommendations
Reset
NAICS 333517 Machine Tool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0465 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,640 $2,000 Not Implemented
UM0465 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,158 $5,250 Not Implemented
UM0465 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,573 $0 Not Implemented
MZ0202 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,722 $7,341 Not Implemented
MZ0202 # 07 Y:2016 07 2016 CONDENSE OPERATION INTO ONE BUILDING $7,503 $0 Not Implemented
MZ0202 # 06 Y:2016 06 2016 CONDENSE OPERATION INTO ONE BUILDING $3,585 $0 Not Implemented
MZ0202 # 05 Y:2016 05 2016 UPGRADE CONTROLS ON COMPRESSORS $9,678 $45,000 Not Implemented
MZ0202 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $3,839 $3,225 Not Implemented
MZ0202 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,654 $5,000 Not Implemented
MZ0202 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,180 $27,600 Not Implemented
MZ0202 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $19,101 $70,000 Not Implemented
SU0402 # 07 Y:2015 07 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $770 $950 Implemented
SU0402 # 10 Y:2015 10 2015 UPGRADE OBSOLETE EQUIPMENT $7,911 $23,244 Implemented
SU0402 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $431 $560 Implemented
SU0402 # 08 Y:2015 08 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $1,495 $2,000 Implemented
SU0402 # 06 Y:2015 06 2015 ELIMINATE/REDUCE AN OPERATION $5,835 $2,320 Not Implemented
SU0402 # 01 Y:2015 01 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $851 $0 Not Implemented
SU0402 # 11 Y:2015 11 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $385 $1,496 Not Implemented
SU0402 # 02 Y:2015 02 2015 DISCONNECT BALLASTS $375 $0 Not Implemented
SU0402 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,500 $297 Not Implemented
SU0402 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $6,073 $600 Implemented
SU0402 # 05 Y:2015 05 2015 REDUCE VENTILATION AIR $8,182 $2,941 Implemented
SU0374 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $5,979 $616 Not Implemented
SU0374 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $379 $276 Implemented
SU0374 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,770 $2,000 Implemented