IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 333519 Rolling Mill and Other Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0026 # 10 Y:2023 10 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,402 $0 Implemented
MU0026 # 07 Y:2023 07 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,405 $0 Implemented
MU0026 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $419 $1,650 Implemented
MU0026 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $101,263 $0 Implemented
MU0026 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $905 $133 Implemented
MU0026 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,370 $6,347 Implemented
MU0022 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $76 $71 Implemented
MU0022 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24 $24 Implemented
MU0021 # 01 Y:2022 01 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,907 $21,510 Implemented
MU0021 # 02 Y:2022 02 2022 ELIMINATE/REDUCE AN OPERATION $588 $0 Implemented
MU0021 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $3,420 $1,933 Implemented
MU0021 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $85 $80 Implemented
MU0021 # 07 Y:2022 07 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $438 $1,877 Implemented
MU0022 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $147 $683 Implemented
MU0022 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $754 $320 Implemented
CW0112 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,658 $100 Implemented
CW0112 # 13 Y:2020 13 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,095 $16,500 Implemented
CW0112 # 12 Y:2020 12 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $342 $0 Implemented
CW0112 # 10 Y:2020 10 2020 INCREASE USE OF AUTOMATION $749,435 $60,000 Implemented
CW0112 # 09 Y:2020 09 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $51,045 $2,000 Implemented
CW0112 # 07 Y:2020 07 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,966 $800 Implemented
CW0112 # 06 Y:2020 06 2020 TREAT AND REUSE RINSE WATERS $15,861 $10,000 Implemented
CW0112 # 04 Y:2020 04 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,678 $800 Implemented
CW0112 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,912 $330 Implemented
UM0460 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,160 $1,100 Implemented