Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
223
matching recommendationsNAICS | 3336 | Engine, Turbine, and Power Transmission Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0510 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,944 | $23,000 | Implemented |
WI0510 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,135 | $640 | Implemented |
WI0510 # 08 Y:2006 | 08 | 2006 | INSTALL SET-BACK TIMERS | $340 | $100 | Implemented |
WV0329 # 01 Y:2005 | 01 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $35,587 | $11,800 | Implemented |
WV0329 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,841 | $10,360 | Implemented |
WV0329 # 05 Y:2005 | 05 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,423 | $8,360 | Implemented |
WV0329 # 06 Y:2005 | 06 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $6,007 | $729 | Implemented |
WV0329 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,535 | $8,398 | Implemented |
WV0329 # 08 Y:2005 | 08 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,468 | $11,504 | Implemented |
WV0329 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,268 | $0 | Implemented |
WV0329 # 10 Y:2005 | 10 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $799 | $299 | Implemented |
WV0329 # 11 Y:2005 | 11 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $732 | $294 | Implemented |
IA0368 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,120 | $1,065 | Implemented |
LE0190 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $65,403 | $20,000 | Implemented |
LE0190 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,074 | $218 | Implemented |
LE0190 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,187 | $33,512 | Implemented |
UM0248 # 02 Y:2004 | 02 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,467 | $2,000 | Implemented |
UM0248 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,890 | $225 | Implemented |
BD0254 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,778 | $6,000 | Implemented |
BD0254 # 03 Y:2004 | 03 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,567 | $521 | Implemented |
BD0254 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,675 | $700 | Implemented |
BD0254 # 06 Y:2004 | 06 | 2004 | USE SYNTHETIC LUBRICANT | $2,104 | $700 | Implemented |
BD0254 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,257 | $1,000 | Implemented |
BD0254 # 08 Y:2004 | 08 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,134 | $3,500 | Implemented |
BD0254 # 10 Y:2004 | 10 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $766 | $0 | Implemented |