Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
42
matching recommendationsNAICS | 33361 | Engine, Turbine, and Power Transmission Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0361 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $322,316 | $3,602,500 | n/a |
MZ0361 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $2,158 | $1,750 | n/a |
MZ0361 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,784 | $1,000 | n/a |
MZ0361 # 03 Y:2024 | 03 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,797 | $4,800 | n/a |
MZ0361 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,633 | $6,555 | n/a |
MZ0361 # 06 Y:2024 | 06 | 2024 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $45,827 | $6,720 | n/a |
MZ0361 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,374 | $117,036 | n/a |
MZ0361 # 08 Y:2024 | 08 | 2024 | MINIMIZE WATER USAGE | $71,580 | $385,388 | n/a |
MZ0361 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,882 | $33,744 | n/a |
MZ0300 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,074 | $5,200 | Not Implemented |
MZ0300 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $783 | $460 | Not Implemented |
MZ0300 # 05 Y:2020 | 05 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,678 | $3,310 | Not Implemented |
MZ0300 # 07 Y:2020 | 07 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,578 | $3,168 | Not Implemented |
MZ0300 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,784 | $200 | Implemented |
MZ0300 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,728 | $4,770 | Not Implemented |
MZ0300 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,598 | $1,650 | Implemented |
MZ0191 # 02 Y:2015 | 02 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,902 | $0 | Implemented |
MZ0191 # 08 Y:2015 | 08 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,458 | $0 | Implemented |
MZ0191 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,548 | $22,425 | Not Implemented |
MZ0191 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,328 | $2,000 | Not Implemented |
MZ0191 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,229 | $3,500 | Not Implemented |
MZ0191 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,535 | $920 | Not Implemented |
MZ0191 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,474 | $3,500 | Not Implemented |
MZ0191 # 01 Y:2015 | 01 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,108 | $26,750 | Not Implemented |
MZ0113 # 09 Y:2013 | 09 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $545 | $902 | Implemented |