IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

548

matching recommendations
Reset
NAICS 33361 Engine, Turbine, and Power Transmission Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0757 # 09 Y:2007 09 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,300 $992 Not Implemented
MA0611 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $98,826 $74,772 Implemented
MA0611 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,486 $186,840 Not Implemented
MA0611 # 03 Y:2007 03 2007 REDUCE VENTILATION AIR $23,954 $17,587 Implemented
MA0611 # 04 Y:2007 04 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,443 $17,876 Not Implemented
MA0611 # 05 Y:2007 05 2007 USE OPTIMUM TEMPERATURE $6,194 $12,675 Not Implemented
MA0611 # 06 Y:2007 06 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $3,833 $5,368 Implemented
MA0611 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $3,330 $3,300 Implemented
MA0611 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $888 $6,305 Not Implemented
MA0611 # 09 Y:2007 09 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $504 $3,600 Not Implemented
UF0390 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $148,376 $619,757 Not Implemented
UF0390 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,981 $8,763 Not Implemented
UF0390 # 03 Y:2006 03 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $87,992 $39,000 Not Implemented
UF0390 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $41,661 $1,080 Not Implemented
UF0390 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,722 $0 Not Implemented
UF0390 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,951 $31,040 Not Implemented
UF0390 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,826 $513 Not Implemented
UF0390 # 08 Y:2006 08 2006 USE PHOTOCELL CONTROLS $909 $306 Not Implemented
UF0390 # 09 Y:2006 09 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $27,903 $20,000 Not Implemented
UF0390 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $437 $347 Not Implemented
UF0390 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,152 $36,122 Not Implemented
UF0390 # 12 Y:2006 12 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,655 $1,610 Not Implemented
UF0390 # 13 Y:2006 13 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $979 $4,996 Not Implemented
UF0390 # 14 Y:2006 14 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $118,800 $8,400 Not Implemented
UF0387 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $1,545 $2,803 Implemented