Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsNAICS | 33361 | Engine, Turbine, and Power Transmission Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0072 # 02 Y:2004 | 02 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,670 | $10,000 | Not Implemented |
UU0072 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,150 | $17,500 | Not Implemented |
UU0072 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,450 | $8,500 | Not Implemented |
UU0072 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $940 | $600 | Not Implemented |
UU0072 # 06 Y:2004 | 06 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $203,380 | $800,000 | Not Implemented |
UU0072 # 07 Y:2004 | 07 | 2004 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $34,700 | $6,000 | Not Implemented |
UU0072 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $17,050 | $21,660 | Not Implemented |
UU0063 # 07 Y:2004 | 07 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,123 | $360 | Not Implemented |
UU0063 # 06 Y:2004 | 06 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,486 | $0 | Not Implemented |
UU0063 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,551 | $860 | Not Implemented |
UU0063 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $212 | $385 | Not Implemented |
UU0063 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,810 | $5,100 | Not Implemented |
UU0063 # 02 Y:2004 | 02 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $15,316 | $6,000 | Not Implemented |
UU0063 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $9,695 | $28,050 | Not Implemented |
LE0190 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,074 | $218 | Implemented |
LE0190 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $65,403 | $20,000 | Implemented |
LE0190 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,450 | $2,500 | Not Implemented |
LE0190 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,187 | $33,512 | Implemented |
LE0190 # 02 Y:2004 | 02 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $17,844 | $50,000 | Not Implemented |
LE0190 # 04 Y:2004 | 04 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,412 | $750 | Not Implemented |
UM0248 # 03 Y:2004 | 03 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,420 | $920 | Not Implemented |
UM0248 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,550 | $1,000 | Not Implemented |
UM0248 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,890 | $225 | Implemented |
UM0248 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $18,156 | $2,400 | Not Implemented |
UM0248 # 02 Y:2004 | 02 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,467 | $2,000 | Implemented |