Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
167
matching recommendationsNAICS | 333613 | Mechanical Power Transmission Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0932 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,655 | $14,750 | Not Implemented |
WM0067 # 01 Y:2015 | 01 | 2015 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $7,657 | $15,000 | Not Implemented |
WM0067 # 02 Y:2015 | 02 | 2015 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $44,425 | $42,690 | Not Implemented |
WM0067 # 03 Y:2015 | 03 | 2015 | COMBINE UTILITY METERS | $35,185 | $4,450 | Not Implemented |
WM0067 # 04 Y:2015 | 04 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $25,416 | $0 | Implemented |
WM0067 # 05 Y:2015 | 05 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,203 | $7,680 | Not Implemented |
WM0067 # 06 Y:2015 | 06 | 2015 | INSULATE BARE EQUIPMENT | $7,737 | $654 | Not Implemented |
WM0067 # 07 Y:2015 | 07 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,191 | $1,600 | Not Implemented |
WM0067 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,586 | $1,680 | Implemented |
WM0067 # 09 Y:2015 | 09 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,111 | $1,245 | Not Implemented |
WM0067 # 10 Y:2015 | 10 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,592 | $640 | Implemented |
WM0067 # 14 Y:2015 | 14 | 2015 | INSTALL OCCUPANCY SENSORS | $731 | $1,876 | Not Implemented |
WM0067 # 13 Y:2015 | 13 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,678 | $0 | Implemented |
WM0067 # 11 Y:2015 | 11 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,495 | $10,871 | Implemented |
WM0067 # 12 Y:2015 | 12 | 2015 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $5,737 | $0 | Not Implemented |
SU0312 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $545 | $175 | Implemented |
SU0312 # 01 Y:2011 | 01 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,080 | $0 | Implemented |
SU0312 # 07 Y:2011 | 07 | 2011 | REDUCE VENTILATION AIR | $13,505 | $13,112 | Implemented |
SU0312 # 11 Y:2011 | 11 | 2011 | OPTIMIZE PLANT POWER FACTOR | $1,695 | $15,783 | Not Implemented |
SU0312 # 10 Y:2011 | 10 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $474 | $880 | Implemented |
SU0312 # 09 Y:2011 | 09 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,778 | $12,185 | Not Implemented |
SU0312 # 08 Y:2011 | 08 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $308 | $450 | Not Implemented |
SU0312 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $588 | $283 | Implemented |
SU0312 # 03 Y:2011 | 03 | 2011 | DISCONNECT BALLASTS | $1,584 | $0 | Implemented |
SU0312 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,822 | $177 | Not Implemented |