Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
102
matching recommendationsNAICS | 333613 | Mechanical Power Transmission Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0312 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,822 | $177 | Not Implemented |
SU0312 # 08 Y:2011 | 08 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $308 | $450 | Not Implemented |
SU0312 # 09 Y:2011 | 09 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,778 | $12,185 | Not Implemented |
SU0312 # 01 Y:2011 | 01 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,080 | $0 | Implemented |
SU0312 # 07 Y:2011 | 07 | 2011 | REDUCE VENTILATION AIR | $13,505 | $13,112 | Implemented |
SU0312 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $545 | $175 | Implemented |
SU0312 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $588 | $283 | Implemented |
SU0312 # 12 Y:2011 | 12 | 2011 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $276 | $4,481 | Implemented |
SU0312 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,162 | $0 | Not Implemented |
SU0312 # 10 Y:2011 | 10 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $474 | $880 | Implemented |
SU0312 # 11 Y:2011 | 11 | 2011 | OPTIMIZE PLANT POWER FACTOR | $1,695 | $15,783 | Not Implemented |
SU0312 # 03 Y:2011 | 03 | 2011 | DISCONNECT BALLASTS | $1,584 | $0 | Implemented |
BD0388 # 01 Y:2011 | 01 | 2011 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $12,465 | $60,000 | Not Implemented |
BD0388 # 02 Y:2011 | 02 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $30,750 | $20,000 | Not Implemented |
BD0388 # 03 Y:2011 | 03 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,470 | $4,000 | Not Implemented |
BD0388 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,581 | $1,200 | Not Implemented |
BD0388 # 05 Y:2011 | 05 | 2011 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $63,847 | $26,000 | Not Implemented |
IC0140 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,573 | $4,032 | Not Implemented |
IC0140 # 05 Y:2008 | 05 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,785 | $2,728 | Not Implemented |
IC0140 # 08 Y:2008 | 08 | 2008 | USE OPTIMUM THICKNESS INSULATION | $19,374 | $4,100 | Not Implemented |
IC0140 # 06 Y:2008 | 06 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,146 | $80,600 | Not Implemented |
IC0140 # 09 Y:2008 | 09 | 2008 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $135 | $0 | Not Implemented |
IC0140 # 10 Y:2008 | 10 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,616 | $0 | Not Implemented |
IC0140 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,093 | $5,980 | Not Implemented |
IC0140 # 11 Y:2008 | 11 | 2008 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $9,973 | $0 | Not Implemented |